Egypt

Area
1 002 450 km2
Population (2012)
83 688 164
GDP (2011)
229 531 US$ mill.
Installed power capacity (2010)
23.5 GW
Electricity consumption (2009)
123 448 GWh
RE installed capacity (2012)
12%
Generation from CSP (2012)
-
Primary energy production (2009)
88.2 MTOE
Primary energy net export (2009)
15 MTOE
Total primary energy supply (2009)
72 MTOE
Total final consumption (2009)
49 MTOE

ISCC Kuraymat plant


New & Renewable Energy Authority (NREA) was established in 1986 to act as the national focal point for expanding efforts to develop and introduce renewable energy technologies to Egypt on a commercial scale together with implementation of related energy conservation programs.

In 1996, a SolarPACES START Mission was requested by the hosting New and Renewable Energy Agency (NREA) and the Egyptian Electric Authority (EEA) of the Government of Egypt, to provide information exchange by independent experts on solar thermal technologies applicable in Egypt. The START Mission recommendations served as the information basis and independent expert evaluation for Egypt’s subsequent application to the Global Environmental Facility, to support the identified 140MW Integrated Solar Combined Cycle (ISCC) power plant project at Kuraymat with a 50 Million dollar grant under GEF-OP7.

Download the Egypt START Mission Report (PDF 2.918 kB)

In Febrary 2008, the Supreme Council of Energy set a target to satisfy 20% of the electricity output from renewable energies by 2020 including 12% from wind, 5.8% from hydro and 2.2% from solar (CSP+PV).

In June 2011, the ISCC Kuraymat project was put into commercial operation. The capacity of the project is 140 MW including a solar share of 20 MW. The solar field consists of 1920 parabolic trough collector modules, arranged in 40 loops, with a total effective aperture area of 130 800 m2.

Egypt is developing its second CSP project, the 100 MW Kom Ombo plant in Upper. The development of the project is being led by NREA and is being supported by the KfW, African Development Bank (AfDB) and the World Bank. The project is expected to be completed by 2017.

Information about the CSP plants developed in Egypt